Progress Reports and checks during the installation

Position 1: Reporting the technical progress of the project by field visit and technical checks.
Position 2: Evaluation of the conformity of the progresses.
Position 3: Reporting the possible risks and delays with their reasons on the construction and the startup periods.
Schedule
The schedule of the visits will be planning with the Investor.
The Progress Reports will be provided within 2 weeks following to the field visits

TurkeyEnglish

ugg boots sale nike free 4.0 flyknit louis vuitton neverfull nike free run new balance schweiz ray ban clubmaster moncler skijacke canada goose herren lacoste schweiz ugg boots schweiz polo ralph lauren schweiz nike free flyknit ray ban outlet fred perry schweiz tommy hilfiger poloshirt woolrich arctic parka louis vuitton taschen nike huarache polo ralph lauren pullover